Part of: Madhya Pradesh Gk set 1

In ..... the government finished building a dam over tawa river in Madhya Pradesh

Category: Madhya Pradesh Gk

Hint: Consider the historical timeline of major infrastructure projects in India.

Correct Answer: B) 1997

Exam Relevance: UPSC, SSC, State PSC

Difficulty: Easy

Explanations:

The Tawa Dam is a significant water resource project located in the state of Madhya Pradesh, India. It is situated on the Tawa River, which is a tributary of the Narmada River. The dam was constructed to serve multiple purposes, including irrigation, drinking water supply, and power generation. The construction of the dam was a major infrastructure project that required careful planning and execution.

The Tawa Dam project was initiated in the late 20th century, and it was completed in 1997. This date is significant because it marks the end of the construction phase and the beginning of the operational phase of the dam. The dam's completion in 1997 was a milestone for the state of Madhya Pradesh, as it provided a reliable source of water for irrigation and drinking water supply, and it also contributed to the state's power generation capacity.

It is important to note that the Tawa Dam is not an ancient structure but a modern one, constructed in the late 20th century. Therefore, the year 1900 is far too early for the completion of the dam, and the year 2000 is too late. The correct year of completion is 1997, which aligns with the historical timeline of major infrastructure projects in India during that period.

Understanding the historical context of such projects is crucial for students preparing for competitive examinations, as questions related to the completion dates of significant infrastructure projects are common in exams such as the UPSC, SSC, and State PSC. The Tawa Dam is a notable example of such a project, and knowing its completion year is part of the broader knowledge of Madhya Pradesh's geography and infrastructure.

Option Analysis:
  • Option A: This option is incorrect. The Tawa Dam was not completed in 1999. The correct year of completion is 1997, which is two years earlier.
  • Option B: This option is correct. The Tawa Dam was completed in 1997, marking the end of its construction phase and the beginning of its operational phase.
  • Option C: This option is incorrect. The year 1900 is far too early for the completion of the Tawa Dam, as it was constructed in the late 20th century.
  • Option D: This option is incorrect. The Tawa Dam was completed in 1997, not 2000. The year 2000 is three years too late for the completion date.

Mnemonic: Tawa Dam: T for Tawa, 97 for 1997

Back to Madhya Pradesh Gk set 1 – Practice all questions