Part of: Madhya Pradesh Gk set 4

Gandhi sagar badh was first of the four dams built on the chambal river in Madhya Pradesh it was completed in which year

Category: Madhya Pradesh Gk

Hint: Consider the historical context of dam construction in India during the mid-20th century.

Correct Answer: C) 1960

Exam Relevance: UPSC, SSC, State PSC, Bank PO

Difficulty: Moderate

Explanations:

The Gandhi Sagar Dam is a significant structure located on the Chambal River in Madhya Pradesh, India. It is one of the four major dams constructed on the Chambal River, which also includes the Rana Pratap Sagar Dam, the Jawahar Sagar Dam, and the Kota Barrage. The Gandhi Sagar Dam was the first of these dams to be completed, and it serves multiple purposes, including irrigation, flood control, and power generation.

The construction of the Gandhi Sagar Dam began in the 1950s, during a period of significant infrastructure development in post-independence India. The dam was designed to provide water for irrigation to the arid regions of Madhya Pradesh and Rajasthan, and it also helps in managing the flow of the Chambal River, which is known for its unpredictable and often destructive floods.

The dam's construction was a major engineering project that involved the mobilization of significant resources and labor. The dam is a concrete gravity dam, which means it relies on its weight to resist the force of the water. The construction process involved the excavation of the riverbed, the pouring of concrete, and the installation of various mechanical and electrical systems to manage the water flow and generate power.

The completion of the Gandhi Sagar Dam in 1960 was a significant achievement for the state of Madhya Pradesh and the nation as a whole. It marked the successful implementation of a large-scale water management project that would have long-term benefits for the region's agriculture and economy. The dam's construction also provided valuable experience and expertise for future dam projects in India.

Understanding the historical context of the Gandhi Sagar Dam's construction and completion is important for students preparing for competitive examinations, as it reflects the broader trends of infrastructure development and water management in India during the mid-20th century. The dam's completion in 1960 is a key date to remember, as it represents the culmination of a significant engineering and developmental effort.

Option Analysis:
  • Option A: This option is incorrect. The Gandhi Sagar Dam was not completed in 1959. Construction began in the 1950s, but the dam was completed in 1960.
  • Option B: This option is incorrect. The Gandhi Sagar Dam was not completed in 1946. The construction of the dam began in the 1950s, and it was completed in 1960.
  • Option C: This option is correct. The Gandhi Sagar Dam was completed in 1960, marking the end of its construction period.
  • Option D: This option is incorrect. The Gandhi Sagar Dam was not completed in 1957. The dam was completed in 1960, which is the correct year.

Mnemonic: Gandhi Sagar, 1960, Sixties

Back to Madhya Pradesh Gk set 4 – Practice all questions